This batch of MSK100-8A multi-spindle drilling machines completed pre-delivery testing and export packing, and shipped to a Southeast Asian customer plant as scheduled.
Before shipment, every machine completed no-load running, positioning accuracy and safety interlock checks, and was packed for sea freight with moisture protection and secure fixing. Documentation includes the operation manual, electrical drawings and a troubleshooting guide for on-site installation and maintenance.
After arrival we will support the customer through installation, commissioning and operator training to ensure production starts on schedule.